Pure Care Vinyl
Pure Care Vinyl
Medical Vinyl
SR 95 Per SQM Meter
Pre-installation
The installation should be carried out in accordance with local standards.
- Make sure the sub-floor is smooth, hard, clean and dry prior to installation.
- The sub-floor should incorporate an effective damp proof membrane.
- Open the package, put the flooring on the ground stack one layer by one layer.
- The material must be allowed to acclimatize 24 hours before installation and the room temperature needs to be between 18-24°C.