SafeStep Vinyl

SafeStep Vinyl

Medical vinyl

SR 112 Per SQM Meter

Select Color

Quantity In SQM Meter

Pre-installation 
The installation should be carried out in accordance with local standards. 

  1. Make sure the sub-floor is smooth, hard, clean and dry prior to installation. 
  2.  The sub-floor should incorporate an effective damp proof membrane.
  3. Open the package, put the flooring on the ground stack one layer by one layer. 
  4.  The material must be allowed to acclimatize 24 hours before installation and the room temperature needs to be between 18-24°C.

Pre-installation 
The installation should be carried out in accordance with local standards. 

  1. Make sure the sub-floor is smooth, hard, clean and dry prior to installation. 
  2.  The sub-floor should incorporate an effective damp proof membrane.
  3. Open the package, put the flooring on the ground stack one layer by one layer. 
  4.  The material must be allowed to acclimatize 24 hours before installation and the room temperature needs to be between 18-24°C.

You may also like

Shopping Bag

Cart Is Empty